Crossing duct laying


Crossing duct laying is a procedure whereby crossing duct path is defined by selecting route-points
and the program generates crossing ducts by accepting the defined path.
The path will be defined by the selected points joined along the shortest possible path.

A precondition for crossing duct laying is to have trench routes placed in the site plan (other TeleCAD-GIS objects are not required).
Crossing ducts are laid along the routes in the site plan drawing.

Crossing duct properties are defined in relation to the method of running the command of crossing duct laying.
Properties can be subsequently changed via Properties window.

The command can be run in three ways:


Procedure

Note:

Crossing duct laying using Crossing duct (designed) command is described further on. The laying procedure is the same for all the above commands. The difference lies in the properties the laid crossing ducts will have. These properties can be changed in Properties window. Properties may be number of ducts,  duct type, year of installation.
In case of crossing ducts, it is not possible to set the number of ducts with the following pattern: number of rows X number of columns. Number of rows is always 1.

From the main menu run  Conduit > Crossing ducts > Crossing Duct (designed) command.
The command is now active. The cursor is displayed in a form of plus sign (“+”) with a message next to it instructing you to Select route-point (Figure 1).

prelaz_zuti1.png

Figure 1

Select the point by clicking on the route-point (Figure 2).
By left-clicking, select the route-point outside the manhole center (crossing ducts do not normally enter the manhole but it is not prohibited).

prelaz_zuti2.png

Figure 2

After clicking, the first selected point is marked with an “X” sign,
and the program expects the next point to be indicated.
By clicking on the next route-point, new “X” sign is displayed (Figure 3).

prelaz_zuti3.png

Figure 3

The path connecting the selected points (marked with “X”) is the path along which the crossing ducts will be generated.
Number of points for defining the path is not limited.

End the command by right-clicking or pressing the ENTER.
Crossing ducts are generated with a corresponding label (Figure 4).

prelaz_zuti4.png

Figure 4

 


Additional information on the principles of linear infrastructure laying in TeleCAD-GIS
are available on Laying Linear Infrastructure page.